Summit Reservoir Seismic Retrofit
San Francisco, California
The project involved the seismic retrofit and other improvements to the two basins at Summit Reservoir. Mitchell worked on only one basin at a time, allowing one basin to be in service at all times. Work begun with the installation of a temporary barrier to seal all openings above the existing dividing wall between the two basins. This prevented debris from the construction site from contaminating the adjacent basin. The barrier also functioned as shoring for the in-service concrete roof above.
Major components of this project included: